Progress Is Being Made

Hello all, sorry for the long absence, a close family member was killed two weeks ago by a drunk driver, that had three previous arrests for DUI, but, somehow managed to still be on the road.

On to the latest update on my house progress, drywall has been put up, master bath tile and flooring has been put in, as well as upstairs hall bathroom tile and flooring, all trim has been put in, slate added around the fire place and most of all my beautiful kitchen cabinets and countertops have been put in.

Master Bath

Kitchen cabinets, stove and microwave to be placed in empty spot
Gourmet Island and Fridge in empty space (granddaughter and middle daughter)
Family room with fireplace
Laundry/mud room off of garage

Saturday, November 5, 2011

Got Brick

Stopped by today and low and behold, they have completed the brick work, no shutters or trim have been added yet.  Snuck inside and the tub is there as well as HVAC/wiring/piping, etc. all throughout. Was able to see some of the insulation in the ceiling and it was super thick, I could not read or find wrap to see exactly what thickenss it was. Expected to start with drywall during the upcoming week, will speak to PM to see exactly what is on schedule. Our tentative closing date is, can you believe, December 23rd, although they did say it could potentially move up or back by a week or so.